Biomass power plantPoland 2010-2012


Scope:
RAFAKO SA & OMIS as consortial partner successfuly erected biomass boiler with auxiliary equipment and storage & feeding system in Jaworzno III Power Plant

 

Technical parameters of the power plant:
turbo generator power – 50 MWe
fluidized-bed boiler – OFz-201
boiler capacity – 201 t/h
boiler efficiency  – 91,5%

 

OMIS scope:
„turn key” design, manufacturing, erection and commissioning of complete biomass storage and feeding system.